Services
MARINE WORKS
Maintenance of marine platforms
MARINE AND SUBMARINE WORKS
- Inspection of substructures of Marine Platforms.
- Removal of metallic debris that is in contact with the substructure of the Platforms.
- Placement of cement-sand bags to a depth of 60 meters.
- Installation of sacrificial anodes.
- Electrical bridging in metal clamps and sacrificial anodes.
- Drilling cracks and fissures at different levels.
- Dismantling and installation of duct defenses and Platform Leg defenses.
- Replacing studs in duct clamps of different diameters, and at different depths.
- Construction and installation of cemented clamps in different nodes.
- Removal of marine growth with hand tool (scrapers).
- Manufacturing, transportation and anchoring of mooring buoys.
- Reinforcement of structural elements of platforms with cement injection into the structure at a density of 1.90 Gr/Cm3, with a minimum compression resistance of 105 Kg/Cm2 at 24 hours. and 200 Kg/Cm2 at 28 days.
- Manufacturing, transportation and anchoring of mooring buoys.
- Installation of Carbon Steel Pipes, Flanges and Valves.
- Radiographic inspections with 100% gamma rays for pipes of different diameters.
- Hydrostatic tests on ducts of different diameters.
- White metal sandblasting to metal surfaces.
- Application of RP-4B inorganic zinc-based primer, 100% self-healing solvent-based at 2.5 to 3.0 mils. thick to metal surfaces.
- Application of high solids catalyzed epoxy finish anticorrosive coating specifications RA-26 to metal surfaces.
- Application of Epoxy Coating in Tidal and Wave Areas.
- Inspection with magnetic particles to detect cracks or fissures in the welds of the structural members of the platforms.
- Weld inspection with digital ultrasound equipment.
- Inspection with A.C.F.M Equipment to the welds in order to detect microfractures in the welds of the structural members.
- Placement of Fiberglass Grating and steel grating on Platforms.



LAYING AND INSTALLATION OF EFFLUENT DISCHARGE PIPES INTO THE SEA FOR THE CHEMICAL INDUSTRY.
- Supply, welding and installation of carbon steel pipes of different diameters.
- Application of RP-4B on carbon steel pipes of different diameters.
- Supply and thermofusion of H.D.P.E. pipes. SDR in different diameters.
- H.D.P.E Pipe Jacketing SDR with carbon steel pipe of different diameters.
- Placement of tanks, fixed to the pipe with 1″ strapping on linings.
- Manufacturing of effluent emitters of different diameters.
- Positioning of the Ship on the coast to pull the Pipe out to sea.
- Placement of diffuser in pipe with the support of Diving personnel.
- Placement of cement-sand bags.
- Manufacture and Placement of Mortar Counterweights.
- Placing Stingray Anchors.
- Hydrostatic Testing of HDPE Pipe

DREDGING
- Dredging of Navigation Channels in different types of material and at different depths.
- Formation of embankments with dredged material.

INSTALLATION AND MAINTENANCE OF THERMOELECTRIC PLANTS
- Laying and installation of chlorination pipelines in the sea.
- Cleaning marine growth inside suction and discharge pipes.
- Dredging of Llamada channels with Suction dredger.
- Calibration of thicknesses in Suction and Discharge pipes.
- Ultrasonic Inspection of Suction and Discharge Pipe Welds.
- Inspection with A.C.F.M. to Suction and Discharge pipe welds.
- Inspection with underwater photography and video of suction and discharge pipes, gates, call channels, etc.

TOPOBATHYMETRIC STUDIES
Topobatimetry Work in Seas, Rivers, Canals, Lagoons, etc. delivering Three-Dimensional reports.