Marine fenders
Maintenance, removal and installation of wharf fenders, as at the APITUX wharf in Tuxpan.
Wharf repair, marine fender maintenance, underwater pile inspection and corrosion protection for wharves in service. One contractor for the deck and the submerged structure.
At Corporativo Costa Afuera (COCOA) we repair and maintain existing wharves and piers: deck slabs, fenders, piles, sheet piles and corrosion protection, with our own divers, cranes and equipment from Tuxpan, Veracruz, Mexico.
We have maintained the fenders at the APITUX wharf and rehabilitated the port infrastructure of the Paseo del Pescador in Acapulco. Below the waterline we work with our own commercial divers, and we protect steel with industrial marine coatings.
Rehabilitation of the port infrastructure at the Paseo del Pescador in Acapulco, Guerrero.
View detailsSubsea inspection of welds and cathodic protection, and replacement of handrails, stairs and decking, with blasting and painting.
View detailsBasin wharf for the UNAM oceanographic vessel “Justo Sierra” in Tuxpan, Veracruz.
View detailsWork clients ask us to quote on existing wharves.
Our fleet, the Tuxpan base and the team behind every project.
We cover both zones of the wharf with our own crews.
Founded by Ing. Ricardo Vázquez Adame, a pioneer of Mexican underwater engineering. In 1979 he led the operations that trained the first 15 professional divers in the country. That technical background supports every project COCOA delivers today.
Founder: Ing. Ricardo Lorenzo Vázquez Adame, a pioneer of the Mexican underwater industry, with a documented track record since 1979.
Both. This page covers repair and maintenance of existing wharves; for new construction see our wharf construction page.
Yes. We maintained the fenders at the APITUX wharf and quote fender removal and installation.
Yes. We carry out underwater pile inspection with our own divers, underwater video and thickness measurement.
We plan each repair with the wharf operator. Tell us about operating restrictions in the form.
Within 24 hours, with a call from our team, once we receive your form.
Let us know the location, the structure type (piles, sheet piles or slab), the damage you see and whether the wharf will stay in service.