Client URL: http://www.pemex.com/
Project executed by COCOA
Date of completion: 1999
Client: PEMEX
Contract ONSM-048/00
A detailed inspection of the underwater section was conducted, focusing on the welds and cathodic protection. In the superstructure of the platform, structural members such as railings, stairs, and floors were replaced. Additionally, sandblasting and painting systems were applied.